SERVICE MENU

Drawing Check Support AI

Likely oversights, with the evidence behind them, against your design standards and past findings.

We check 3D models, assemblies, and 2D drawings against your internal design standards (tolerances, material constraints, clearances, and more) and against past drawing-check findings, and present candidate oversights with their evidence. This is not a package of standard check items: it is custom development built to your own standards and unwritten rules.

Data you need to start: design standards documents and records of drawing-check findings. Any format is fine, and if they are scattered we review them in the initial assessment.

3 findings

  • Clearance 2.0mmInternal standard 3.0mm or more
  • Material not specifiedSUS304
  • Chamfer note missingC0.5
EvidenceInternal standards DS-102Similar drawings

Symptoms this addresses

  • 01

    Waiting for drawing checks has become the bottleneck of design.

  • 02

    The quality of findings depends on the experience of the reviewer.

  • 03

    Junior engineers' drawings are sent back repeatedly because the internal standards are unwritten.

  • 04

    In derivative designs, past changes and findings are not carried over, and oversights slip through.

How it works

The system reads drawings and models and checks them against your standards and past findings. Every finding carries its evidence — the relevant clause of an internal standard, a similar drawing, a past finding — and the engineer decides whether to accept it. The record of those decisions raises the accuracy of the next check.

Where human judgment sits

The final judgment belongs to the engineer. The AI goes as far as presenting candidate oversights and their evidence.

Drawing Check Support AI

Bracket B-1024

CheckingComplete
100%

Finding

  • 01

    Clearance 2.0mmInternal standard 3.0mm or more

    Internal standards DS-102
  • 02

    Material not specifiedSUS304

    Similar drawings
  • 03

    Chamfer note missingC0.5

    Internal standards DS-102

3 findings

What you'll see in the demo

We check one or two drawings you bring with you against a sample set of standards we prepare, and you see how candidate findings and their evidence come back. You can judge on the spot whether the granularity of the findings, and the way they are shown, fit how your floor works.

How a rollout proceeds

We use a gated approach: an initial assessment measures your current state, and the effect is confirmed at each stage before moving to the next phase.

  1. 01

    30 min

    Free consultation

    We ask about your drawing-check flow and where the standards documents and finding records live.

  2. 02

    1–2 weeks

    Initial assessment

    We review the volume, format, and confidentiality classification of the standards and finding records.

  3. 03

    4–8 weeks

    Effectiveness validation

    We run a sample check on past drawings and measure how far the findings agree.

  4. 04

    3–6 months

    Floor integration and field validation

    We deploy alongside the actual drawing check of one department.

  5. 05

    6 months and beyond

    Ongoing accuracy improvement and sustained adoption

    Under a continuing engagement, we tune accuracy on real data from the floor, sustain adoption on the floor, and guard against the AI model's accuracy degrading over time.

  6. 06

    Progressively

    Expansion

    We extend to other departments, other sites, and related processes.

The scope and duration of the free validation, and the criteria for moving to a paid engagement, are set out in writing before we start.

Illustrative rollout

Whatever the field or the situation, we provide solutions that fit the way your floor actually works.

  • Automotive components

    Applied to the checking of jig and equipment drawings. Unlike production parts, the standards for equipment drawings were thinly documented and rested on the memory of veterans. Standards are reconstructed from past finding records, and candidate findings are presented with their evidence. The final judgment stays with the equipment designer.

  • Industrial machinery

    Applied to the pre-shipment check of machines whose specifications change with every order. Findings and rework records from past projects surface candidate oversights caused by specification differences, so the checker can concentrate on reviewing the candidates.

Security

We deliver configurations in which your drawings and standards documents are not used to train AI. On-premises and closed-network deployments, storage within Japan, and limiting the range of staff with access are all supported.

FAQ

In 30 minutes, let's work out together where drawing check takes its time.

What we do in the 30 minutes

  1. We'll ask about your current challenges.
  2. We'll share relevant case studies.
  3. We'll align on an approach together.